Harryproa

Directions Website Contact the business

Harryproa An evolutionary Rob Denney conceived proa series combining space, speed and safety with ease of buil

Yesterday we kited the cargo proa to Leleuvia and back, round trip of 28 miles.  First and last parts under ePropulsion ...
30/09/2026

Yesterday we kited the cargo proa to Leleuvia and back, round trip of 28 miles. First and last parts under ePropulsion 6 kw/8 hp pod motor running at 2-3 kw. The sun was out, provided ~1 kw of power via the 2 x 575W panels. Breeze 10 -12 knots (no whitecap waves). Once we cleared the coral bits, we had the best part of 10 miles each way with the 2 kites. Didn't have to trim them once they were raised, despite big variations in our course. The boat was well balanced, held course for minutes at a time. Speed was 5+ knots, top that I saw was 7.3, motor started regen at 6. The kites are only 24 sqm/250 sq' each, I need to increase the mast height so we can fly 2 x 42 sq m. The masts are only to aid setting and retrieval and to keep the kite vertical. The loads are minimal, so the mast can be much smaller section and lighter than a conventional mast. Setting and retrieving were easy, took less than a minute.

Front kite in the video is a twin skin with the lowerskin mostly removed. It's getting a bit tatty but still works. The aft one is a 10 year old twin skin, quite nice, but a bit of a handful when dropped until the air is expelled. We are working on this as an alternative to removing the inner skin. Glider development has come a long way since these were made. We are looking at custom 60 sq m designs for the cargo proa.

The leeboards were tied with dyneema lines through the hull. Stretch/creep was unacceptable so today I fitted threaded rods, despite my dislike of metal on boats. We bumped into a reef yesterday (the chart is based on photographs so depths are unreliable/missing) and broke a rudder (as it was designed to), which I also fixed today. I will probably bite the bullet and build Harryproa rudders/daggers which can be raised and kick up in the near future.

Trevor (kite guru) is here for another week, we should get some more data and videos before he leaves.

Video at https://www.youtube.com/watch?v=CxNR7194z-w

Rob

19/03/2026
We finally got the shed finished enough for me to complete the cargo proa enough for initial testing.  About 3 times as ...
06/12/2025

We finally got the shed finished enough for me to complete the cargo proa enough for initial testing. About 3 times as large as the original, with classrooms and maybe an apartment upstairs and additional workshop space behind the containers.

After I decided on the kite rig, I spent a week in Brisbane catching up with the latest development. Initially sceptical, I was eventually sold on the idea. To the point that there was no way the cargo proa would have a conventional rig, so there was no reason for the compromises this would require. https://www.youtube.com/watch?v=MM1aKRuaq8U

I returned to Fiji and chopped the masts down to 2m (enough to mount a kite mast on, if required) and reduced the beam to 5.5m. This did not leave room for the toybox so it was tossed and replaced with a net and walkway.
Simplified the rudders by mounting them on horizontal axles on the tapered part of the bow. The blade starts horizontal and clear of the water. As it is rotated (by pulling on a line, no wheel needed), more rudder is immersed. This allows it to hit things, kick up and be pulled back down without leaving the cockpit. It also allows steering in very shallow water as it can bump along the bottom. The lee board is mounted the same way, but is lifted when there is no load on it. It should be an easy boat to beach and to sail over coral. Apart from a paddle, it is the least complicated rudder arrangement so far.
Installed the 6 kw/8hp Epropulsion pod motor on a tube through the small hull shelf. The tube allows for it to kick up for sailing or hitting stuff and to be rotated to push the boat in any direction.
Built the unstayed gunter rigged mast and mounts for the kite on the short hull. This is probably not permanent, as my biggest kite is 42 sq m. I'll probably end up with 2 of them on the long hull. The kite in the video is 16 sqm, in 20 knots of breeze on a 15m Harryproa.

This was completed in time for a month of testing. We lost the first week as the students were on midterm break so couldn't launch it. Lost the second week when I damaged my back. Lost some more when the students went on a field trip and then it poured with rain for a couple of days. Ended up with less than a week before the students left the premises.
16 of them lifted/slid the boat on tyres so the mast was over the end of the ramp, which is barely covered at high tide, has a one metre drop at low tide. We strapped 2 empty 200l drums under the mast. This made it much easier to move the boat until we could put a drum under the short hull. Another lift and push and another drum under the short hull, then 2 more under the long hull. 6 in total. Then it was an easy slide into the tide. An interesting learning curve. Next time, it will be far simpler, may not need any students.
Upshot was the entire boat was clear of the water, bar a metre of the short hull, due to the motor being aft of centre and uneven drum spacing. Total weight about 1,200 kgs/2650 lbs. Still got 8 kwh battery (75 kgs/165 lbs), 4 x 575W solar panels (130 kgs/286 lbs), rudders and daggerboard (30 kgs/66 lbs), kite and mast (40 kgs/88 lbs) and safety gear to add, so a bit more than 1,500 kgs/3,300 lbs ready to work. Not bad for a 24m/80'ter with mostly solid glass hulls.
We loaded the battery and installed the rudders and took off down the river. The rudders worked, but the temporary steering system was a bit too temporary, broke and we ended up in the mangroves. The water taxi with 8 hp E motor and photographer on board pulled us out, we strapped the taxi to the cargo proa stern and used it to steer us back to the ramp. The joys of testing new ideas. ;-) Top gps speed was 8 knots 2 min average with the throttle just engaged, according to the throttle man. Not sure how much 'just" is as I was organising/breaking the steering. Photos and video are all on the photographers phone with a cracked screen which he dropped in the water.
I intended to repair the steering and have another go, but the students had exams and we ran out of time. 30 of them (approx 2.5 tons) piled on board and the top of the 200mm deep antifoul was just showing. 10 tonnes load will only be for sheltered waters, and will be shared by both hulls. Normal use will be 'small quantities often' as opposed to the 'large loads occasionally' model the ships use. The students then picked the boat up and carried/slid it up the ramp.
I have made some adjustments to the motor mount and am pondering the steering arrangement.
I am visiting Aus next week, will be back and ready to relaunch and resume testing when the students arrive in February. There is a bunch of other stuff (some good, some bad) going on here which hopefully will be clarified by then.
There is a bit more detail and more regular updates at https://groups.io/g/HarryProa The full story of the boats is at https://www.harryproa.com/buildingblogs/cargo-proa-building-blog The reasoning (will be updated over Xmas) behind the cargo proa is athttps://static1.squarespace.com/static/65193472eadeb133523da70f/t/65d603737972197f559e6632/1708524406510/Cargo+Proa+Prototype.pdf

30/01/2025

Fiji update #10 is at

Decided I'm not going to die wondering, so I ordered the composite materials and vacuum equipment for a C50 and employed...
17/10/2024

Decided I'm not going to die wondering, so I ordered the composite materials and vacuum equipment for a C50 and employed a kiwi boat builder/foreman to ensure it is built to a high standard. Also to give me time to work on other projects such as the cargo proa testing and certification, recycling plastic, dessicating (not composting) toilets, electric cars, solar farms, motorised shipping containers (maybe) and advocacy for remote villagers.

The boat will be built here (CATD Fiji) by graduates of our 2024 Sustainable Boat Building Course, starting in February. We will video the build, incl screw ups and record the costs and hours. Build time is unknown as building village suitable boats (fishing canoes, solar/electric water taxis and mini cargo proas) will have priority.

Materials spreadsheet attached. Enough to build all the composite parts, including unpainted hulls, decks, fitout, 2 carbon masts incl tracks, booms, beams and rudders. Amounts are based on areas, plus ~10% wastage, plus rounding up to next roll, box or sheet. Shipping, tax and duty will add about 35%. Tax and duty should be reclaimable if the boat is exported.

I'm not sure I will be able to resist the temptation to experiment, but the intention is to build it according to the plans. ;-). Only diversion so far is to use 20mm 100 kg foam on the bottom instead of 25mm 80 kg.

UPDATE 9Zero emission shipping things are starting to happen at CATD.   Not least because we have usable boats in the wa...
23/02/2024

UPDATE 9
Zero emission shipping things are starting to happen at CATD. Not least because we have usable boats in the water. One of the upshots of this is an increase in curious visitors, many of whom are doing interesting things, but need sustainable transport to make them happen.

We fitted the 5 x 300W solar panels to the Rewa water taxi prototype built by the students and powered by the outboard converted from petrol to electric. It worked a treat. The attached photo and video show it operating under 2 of the panels (600W, less than 1 horsepower), no battery. Top speed was 4 knots, with 2 people on board on a cloudy day. We are now waiting for MSAF approval prior to fitting batteries and taking it down to Rewa, a 6 mile open water trip, followed by 9 miles of river. Once it arrives, it will be used by as many drivers and passengers as possible and the feedback will be used to design the production version. These will be built by graduates of the Sustainable Boat Building programme in the new UN Innovation Hub at CATD.

25 years ago, I realised that kites are by far the best way to use the wind to power boats. Why? They are attached to the deck, so there is no heeling, they require minimal deck gear so they are far cheaper than conventional rigs and they can be flown high where the wind is stronger and more consistent. On the down side, (and what I and many others have spent a fair bit of that 25 years looking for solutions to), they are difficult to launch and retrieve on a small/medium boat, have the potential to unexpectedly quadruple their power output if not carefully controlled, are a nightmare if they fall in the water and have kms of small diameter string which tangles easily.

I spent a couple of days pre Xmas with old friend Trevor Jack on KitetiK, a 15m harryproa used for testing kite ideas. We used a kite handling system devised by Trevor and a 17 sq m/183 sq' (projected area) paraglider, modified to fly like a kite board traction kite. It took a while to get it set up, (once we mark the lines it will be set and forget) but then we could leave it and steer wherever we wanted to from hard on the wind to broad reach with no one touching the kite. Launching and retrieving was simple, using the mast to hoist and retrieve the kite. Once flying, all the loads were taken by a single strong point on the deck. This is a huge contrast to a sailing rig where the sail force acts half way up the mast and the loads to shape, control and support the sails are an order of magnitude higher than the force propelling the boat. As a bonus, the kite loads are lifting the boat, whereas conventional rigs act to heel the boat and depress the bows.

17 sq m is about 1/3rd of the designed sail area, not much more than a conventional storm rig. We managed 6 knots top speed in maybe 10 knots breeze (no white caps, despite wind against tide) shunting through 90 degrees upwind.

This performance and ease of handling was impressive enough to justify bringing Trevor and Gavin Mulvay (kite, electronics, EV's, and a whole bunch of other things guru) over to Fiji to try it on the tender for the cargo proa. Gav also cut and sewed a different type of kite which may be easier to use.

I had 2 weeks to finish and install a lee (actually a weather) board and a mast (one of the booms for the mini cargo proa crabclaw rig), make a paddle and set it up for steering. The mast's sole purpose is to launch and retrieve the kite. Once it is flying, the mast does nothing and is unloaded, or so we thought.

The guys arrived and we spent a couple of days sorting things out, doing some test runs, installing the bridles on the kite Gavin made and then set off for Leleuvia, 12.5 miles/20 kms away. A broad reach, barely 10 knots of breeze, with the paraglider/kite from KiteteK. Raising and lowering it was simple using the mast. Pull it up, release a string and it gently fills. How gently is controlled by the string release speed. Reverse the procedure to drop it. Shunting is a couple of seconds of pulling lightly on one line. Faster than the time it took to get the paddle from one end to the other.

Top speed was 9.6 knots, all went smoothly until the mast broke between the bearings. A function of the small bury (distance between the bearings) waves from the side and a spar not designed for the job. Nothing to do with the kite.

We spent 2 pleasant nights at Leleuvia and took the boat for a shallow water reach along the beach with a hand held 2.5 sq m/27 sq' kite. Got along at about jogging pace with not much leeboard down. I'd definitely carry one of these (maybe a bit bigger) as an emergency kite. We also test flew the kite Gavin had built (see attached). It needs tuning, but has potential. We jury rigged the mast with stays for the trip back. Repeat of 9+ knots top speed in similar breeze but the stay angle was insufficient, so we broke it again in the cross seas, nothing to do with the kite. We had a play with a couple of hand launched kites, then the breeze died, so we called for a tow to CATD. Gavin had to go home, so Trev and I rigged an inverted Y mast using bamboo. Much stiffer, but we managed to break this too. Definitely a function of the kite this time. We learnt a lot of lessons, not least that big kite techniques on small boats are difficult and kite selection is important. On the bright side, the problems with the masts will not apply to the cargo proa, so we are proceeding with the build of 2 large kites. see videos at https://www.youtube.com/watch?v=-uK7q7iCaGg. and https://www.youtube.com/watch?v=-uK7q7iCaGg

The tender is an 8.5m/27' catamaran with 400mm/16" wide, double ended hulls, flat bottom and no rocker. It weighs about 250 kgs/550 lbs and draws about 20mm (3/4") empty. A bit more than double both of these with us three and our gear onboard. The draft enabled us to skim over coral with the leeboard up and the steering oar out of the water to avoid having to go round outcrops. Shunting (couple of seconds and almost no effort) meant we could reverse immediately if it got too shallow. A definite plus in this part of the world. Due to the hull shape it is easy to steer by weight shift with the kite attachment point amidships on the lee deck, opposite the leeboard (actually a weatherboard). Move a person a metre or so and the steering paddle is not required. The hull shape also means that drag is unaffected by shape changes when weight is added.

We were given a 6 kw/8 hp electric outboard and battery in lieu of grant money owed. We fitted it on the tender and with 6 people on board did 5 knots using 1 kw (1.3hp) of power. Impressive enough that both Gav and Trev intend to build smaller versions of the tender. Four of us took it to Leleuvia for lunch, came back in the afternoon, had almost enough battery left to repeat the round trip. Petrol cost and emissions? Zero. Top speed was 11.2 knots, which implies the prop is a bit fine, we will test some others.

The students took the tender for a blast and managed to whack the hull with the outboard, at full speed (see pic). Due to the multiple bulkheads in the hulls, it didn't sink and because it is a flat panel construction, the fix was a 20 minute job with a backing plate and a couple of layers of glass.

The end result? We are not there yet with a solution to zero emissions small/medium boats, but we are a lot closer than we were with the conventional and wing rigs. The rig works well enough to buy a couple of kites for the cargo proa and see how it goes. There will have to be a lot of disadvantages to outweigh the advantages: no heeling loads, low cost, long life, easy handling (no winches, 2 finger control most of the time), light weight of the kite and mast, no deck gear, easily learnt basics, a simple problem solver mode and sailing with the bows lifted instead of being pushed down.

I'm modifying the cargo proa and will launch it when we have MSAF approval. The mods aren't simple as the boat is set up to do everything from the windward hull. Trev and Gav will be back with the new kites for the next chapter when it is launched .

Gavin had a small waterproof electric motor with a 3D printed housing which he uses to propel his 7m trailer sailor. We mounted it on a piece of wood and used it to push the tender, then dropped it in the water. A floating outboard! (see attached). This type of motor opens up some interesting possibilities for converting petrol outboards, powering canoes and building our own low cost outboards.

There were a few surplus to requirements solar panels available, so the students put them on the roof of the boat shed, Dels the sparky wired them up and we have Fiji's first solar electric boat recharging station. Not particularly elegant, but it will do the job.

We are organising Boat Master courses for the students and staff so they can take the boats out fishing and snorkelling. An impossibility with the outboard on the 8m CATD fibre due to the cost of fuel.

I spent a couple of pre Xmas days working with the plastic recycling people. Built 2 frisbees (see attached) from plastic bags and scrap dress material. The equipment to process unwashed and unsorted plastic is on it's way from China, we hope to be operational in April. The frisbees are part of the school program planned as the next step after we get set up at CATD.

Last week we attended the award ceremony for the UNDP grant awarded to CATD for a project to develop mud brick houses, similar to the ones built in Ba in 2005, which were the only buildings to survive cyclone Winston in 2017. One of the people involved in building them is now at CATD. There is potential to use the glass we are crushing as a sand substitute and perhaps a couple of uses of the recycled plastic in the construction of these houses. Interesting stuff.

For those who are curious about CATD and what it is about, have a look at this video.

There are boat building workshops in the pipeline for Matuku Island (Lau group) and Taveuni, both beautiful places. I won't be running the workshops, but intend to visit and have a look around.

In Harryproa developments, www.harryproa.com is back on line, complete with some stunning new renderings Steinar has been working on. There are now 2, perhaps 3 C50's to be built here, once the Innovation Hub shed is complete. This is an ongoing process, with a lot of disparate elements that need to come together before construction can begin.

We are having a great time, with great people in a great place.

If you don't wish to receive these updates, please let me know.
Previous updates can be found at http://harryproa.com/?p=3788
More information on Harryproas generally is at http://harryproa.com/?p=3788
Discussion is at https://groups.io/g/HarryProa. and https://www.facebook.com/Harryproa/

Address

Gold Coast, QLD

Alerts

Be the first to know and let us send you an email when Harryproa posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Harryproa:

Shortcuts

Share