25/04/2021
Lauriston apartment episode 6. Back downstairs to start the second piece of 'remodelling'. A cupboard at the back of the hall and under the stairs of about 2M X 2.5M featured an internal cupboard (!), storage space and space where the old hot water cylinder once was. Outside of that the stair emerged from above with a banister matching the sauna cladding.
Plan: remove all the cladding and move the entrance back about 75cm to bring the hall cupboard out into an enlarged hallway, build a wall to replace the banister and create a utility bay under the stairs. In a future project the area at the rear will feature a second toilet and possibly shower, no time now but everything put into place to feed it/power it/drain from it.