PROJECT NAME CLIENT PROJECT DESCRIPTION START DATE FINISH DATE PROJECT VALUE
Technical Assistance to the National Ganga River Basin Authority, of the Government of India Direction Générale du Trésor, Governement of France, Government of India, Ministry of Environment and Forests, NGRBA FASEP Technical Assistance to the NGRBA for the National Mission to Clean Ganga
Providing Technical Assistance to
the Ministry of Environment and Forests for the Implementation of the first Projects of the World Bank funded NGRBA Program (1.5 billion USD). Technical Assistance includes review and validation of Feasibility and Detailed designs, Tender docs, as well as planning and training. Apr 2011 On-Going 1.5 billion USD
PUR IV European Union (FED) Urgent works to improve
hygienic conditions in the
city of Abidjan.
1. Construction of 7 new
Pumping stations and
laying of 10 km of gravity
pipelines and rising mains.
2010 October 2010
Institutional Study
European Union (EDF) A study costing 600 000 Euros to reform the wastewater sector in Ivory Coast. It includes Institutional, Legislative, Financial, Capacity Building, and good governance aspects, and aims at setting up a new and independent institution for the management of wastewater and storm water, complete with proposals for tariffs etc. 2010 October 2010
Sewerage Master Plans for the Towns of Bouaké, San Pedro and Daloa European Union (FED) Updating of Sewerage and SWD Master Plans for 3 towns, phasing of works and feasibility study for first phase in 2 towns. 2010 October 2010
Contract WW 239.C Wastewater Management Authority WW 239.C, Provision of Sewerage facilities to Unsewered areas of Bain des Dames. Feasibility and Detailed Design, production of Tender Documents March 2012 On-Going
Contract WW 211.X Wastewater Management Authority/Padiachy Contractor Ltd Provision of Sewerage facilities to Cité Rozano, Vacoas
Design of 165 House Connections, 2 500 m of street and main sewers, Pumping Station and 500 m of rising main. As Consultant for Contractor for a design and build contract 2011 On-Going
Contract WW 80.F, Plaines Wilhems, Stage 1, Lot 1A
Wastewater Management Authority/Sotravic Ltd Design of 4 000 House Connections, 20 km of street and main sewers. As one of three Consultants for Contractor for a design and build contract. 2010 On-Going
Various EIA and Environmental Monitoring Plan Reports On-Going
Setting Up of a Monkey Breeding Farm Biosphere Ltd
Design and Supervision of Monkey Breeding Farm for Messrs Biosphere Ltd On-Going
Study of Natural drain Médine Sugar Estates Ltd
Study of Natural drain 3km long at St Jaques to assess feasibility of new housing development 2009 2009
Design and supervision of sewerage Medine Sugar Estates Ltd (Inetgrated Resort Scheme) Design and supervision of sewerage, Sewerage Treatment Plant, Irrigation network for Luxury Tourist Estate at Tamarin. On-Going Project Frozen
Design of sewerage Facilities Westrock Luxury Housing (Phase II) Design of sewerage, Sewerage and on-site disposal systems, and storm water drainage for Luxury Housing Estate at Tamarin 2008 2009
Technical Assistance To Direction de l'Assainissement, Ivory Coast European Union Technical Assistance: Review of design and tender documents, review of tender analysis, ToR for Review of Master Plans for 3 towns, ToR , procurement and follow up for Institutional Study (as Sub-contractor for BCEOM) 2008 2010
Technical Audit, DR Congo BCMI, DR Congo Technical Audit, Environmental Management, World Bank Financed Infrastructure and Reconstruction Projects of a total value exceeding USD 500 million. Nov-06 Dec-06 USD 500 Million
Technical Audit, Environment Management, DR Congo BCeCO, Democratic Republic of Congo Technical Audit, World Bank Financed Infrastructure and Reconstruction Projects of a total value exceeding USD 500 million, looking into inter alia, the procurement procedures Apr-06 May-06 USD 500 Million
Port de Grand Baie ERS, 263 Villas Knights Property Design and Supervision of Sewerage Reticulation, Pumping Station and Rising Main Dec-08 On-Going Sewerage 35 million MUR
First Avenue ERS, 44 luxury Villas Lightway Properties Design of Sewerage on-site disposal systems, and storm water drainage at Tamarin 2nd September 2008 On - going
Feasibility Study for wastewater disposal on 27 low-cost Housing Estates - Phase IV - Contract WW152X Wastewater Management Authority Feasibility Study for Rehabilitation / Provision of Sewerage Infrastructure in CHA and Low-Cost Housing Estates (in Joint Venture with SJPCE) 10th September 2008 On - going
Design & Construction of Sewer Reticulation and House Connections & Maintenance Works - Contract WW151Z Wastewater Management Authority / Padiachy Contractor Ltd Design of Street Sewers and House Connections as designer for a design and build project 24th September 2008 On - going MUR 60 million
Design & Construction of Sewer Reticulation and House Connections & Maintenance Works - Contract WW150Z - Lot 2 Wastewater Management Authority / PADCO Design of Street Sewers and House Connections as designer for a design and build project 18th June 2007 On - going MUR 60 million
Integrated Resort Scheme at Tamarin, 53 Luxury Villas Medine Sugar Estates Ltd Design and supervision of sewerage, Pumping Stations, Sewerage Treatment Plant, Irrigation network for Luxury Housing Estate at Tamarin 06th June 2007 Delayed
Upgrading of Existing Refuse Transfer Station at La Brasserie Government of Mauritius EIA and Design of Infrastructure for Solid Waste Transfer Station 10th April 2008 Design completed November 08 60 million MUR
Rehabilitation of Sewerage & Storm Water Systems at Anjalay Stadium Ministry of Public Infrastructure Design and supervision of rehabilitation of sewerage and stormwater infrastructure for football stadium (Joint Venture with SJPCE) Feb-07 Supervision On - going MUR 35 - 40 million
Morcellement Palmyre Medine Sugar Estates Ltd Design of Stormwater drainage for 200-lot Housing Estate 27th June 2008 19th September 2008
Westrock Luxury Housing (Phase I) Davyland Design of sewerage, Sewerage Treatment Plant, Irrigation network and storm water drainage for Luxury Housing Estate at Tamarin 13th June 2007 17th December 2007 MUR 25 million
Design and Construction of Sewer Reticulation & House Connections - Lot 3 & 4 - WW88X Sotravic / Wastewater Management Authority Design of about 5 km of Street Sewers and 200 House Connections. As designer for Contractor of a Design and Build project for the WMA. Finances by the Government of Mauritius / World Bank 14th September 2004 15th December 2005 MUR 100 million
Design and Construction of Sewer Reticulation & House Connections - Vallee des Pretres - Lot 1 & 2 - WW88X Transinvest / Wastewater Management Authority Design of about 10 km of Street Sewers and 600 House Connections. Financed by the Government of Mauritius / World Bank 14th September 2004 15th December 2005 MUR 100 million
EIA Report Monkey Breeding Farm at Riviere Des Anguilles Bioculture Ltd Drafting of the Environment Impact Assessment Report 2005
Design and Supervision of Sewerage Network Mon Desert Mon Tresor Creation of Satellite Town at Ebene - 22 km of sewers, 2 pumping stations - Design and Supervision 2003 2007 Infrastructure: MUR 950 million; Sewerage: MUR 115 million
Design and Supervision of Sewerage, Water and Road Networks and sewerage pumping station at Morcellement La Confiance - 85 Lots Medine Sugar Estates Ltd Design and Supervision of Sewerage, Water and Road Networks and sewerage pumping station at Morcellement La Confiance 16th February 2004 Design completed July 2004 Supervision 07th November 2006
Design Water and Road Networks and on-site disposal at Morcellement Bassin - 160 Lots Medine Sugar Estates Ltd Design Water and Road Networks and on-site disposal at Morcellement Bassin 2004 2006
Design Water and Road Networks and on-site disposal at Pierrefonds land parcelling - 240 Lots Medine Sugar Estates Ltd Design of Water and Road Networks and on-site disposal at Pierrefonds land parcelling 30th January 2007 2007
EIA Report Monkey Breeding Farm at Tamarin Biodia Ltd Drafting of the Environment Impact Assessment Report 2004
EIA Report and Design of Sewerage Network for land parcelling at Roches Brunes - 275 Lots Medine Sugar Estates Ltd Drafting of the Environment Impact Assessment Report and Design of Sewerage Network 2004 MUR 25 million
EIA Report Medine Sugar Estates Ltd Drafting of the Environment Impact Assessment Report for the Sub-division of land for Residential purposes - 4 sites - Land area 40 Ha 2004
Construction of Sedimentation Tank, Holding Tank, New Pumping Station and Rising Main Floreal Knitwear Design . Financed by Floreal Knitwear 2004
Construction of 500 low cost houses including on-site and off-site infrastructureand on site disposal systems National Housing Development Company Design and Supervision. Supervision Stage: At the head of a team including Architect, Quantity Surveyor, Site Engineers etc. Design of water and sewerage pipelines, septic tanks and leaching fields 27th February 2004 2007 MUR 250 million
Project Management of construction of a school Quran House Responsible for general supervision of project team and all contractual matters, including tendering, contract documents and payments 2003 MUR 200 million
EIA Report Medine Sugar Estates Ltd Drafting of Environment Impact Assessment Report for the Sub-division of land for Industrial purposes at Bambous. Land area 9 Ha 4300 m2 2003
EIA Report Epping Investments / Jade Group Drafting of Environment Impact Assessment Report for the Sub-division of land for Industrial purposes at Trianon. Land area 26 A 87P 2003
EIA Report Splendid View Ltd / Jade Group Drafting of Environment Impact Assessment Report for the Sub-division of land for Agricultural purposes at Albion. Land area 97 906 m2 2003
Sub-division of Land for residential purposes at Palma The Medine Sugar Estate Design and Supervision of Water supply and On-site disposal sewerage system. 2003
Preliminary Environment Report (EIA) The Medine Sugar Estate Drafting of the Preliminary Environment Report (EIA) for Sub-division of land for residential purposes at Mont Roches. Land area 20,350 m2 - 46 Lots. 2002 -
Environment Impact Assessment Report Societe de Palmyre Drafting of the EIA Report for the Sub-division of land for residential purposes at Riviere Noire. Land area 5.75 Ha. 2002 -