Fiona's Paradise

Fiona's Paradise Constructed from shipping containers, appointed for tropical relaxation, and steps from the beach.

First floor of the house is framed, finished with those silly little screws. Hot and cold water tie ins for the house ar...
29/05/2024

First floor of the house is framed, finished with those silly little screws. Hot and cold water tie ins for the house are done, and 2/3 of water lines are installed. About half the downstairs electrical work is finished as well. Next we finish water and power, insulate, and start hanging drywall ..progress

The slider and picture window are finally installed in the upstairs owner's master suite. Look at that view!27x33 roof s...
04/05/2024

The slider and picture window are finally installed in the upstairs owner's master suite. Look at that view!
27x33 roof similar to what's over unit 4 coming soon

Starting to frame inside the owner's house. Moving right along
10/04/2024

Starting to frame inside the owner's house. Moving right along

Well, it's finally done. 12 yards of 3500psi concrete, out of the truck, flat and finished. The big L shaped deck over t...
27/02/2024

Well, it's finally done. 12 yards of 3500psi concrete, out of the truck, flat and finished. The big L shaped deck over the marquesina, 52x10' on the long side, 23x11' on the short part, makes an amazing rooftop hangout space for the main house. We also got the driveway finished as well as a 3x12' sidewalk behind the house for concrete measurement "overage". Gotta love the view from that upstairs deck.

Getting close to concrete time again. Everyone likes a little balcony with an ocean view. This one happens to be 10x52 f...
08/02/2024

Getting close to concrete time again. Everyone likes a little balcony with an ocean view. This one happens to be 10x52 feet over the owner's marquesina parking area and someday outdoor second kitchen. It wraps around on the street side to make the bottom of the L another sizeable space of 10x23 feet. ..and check out that view.

Two days ago, the municipio "operation  brea" street repaving finally visited us and gave us a street (first picture). T...
25/01/2024

Two days ago, the municipio "operation brea" street repaving finally visited us and gave us a street (first picture). Today, the crew was back as we had them pave our parking area. This should finally cut down on layers of dust on our solar panels, and makes the place look... well... done.

A little assembly line work. Setting up fixtures to speed drilling 3 holes in each of 20 galvanized angle pieces, soon t...
18/01/2024

A little assembly line work. Setting up fixtures to speed drilling 3 holes in each of 20 galvanized angle pieces, soon to be mounting stanchions for our railing posts on the marquesina roof, master suite balcony. 20 pieces, 60holes, one cobalt drill bit, add water for longevity.

The work on the marquesina superstructure is coming right along. The border that will be the permanent outer concrete fo...
17/01/2024

The work on the marquesina superstructure is coming right along. The border that will be the permanent outer concrete form is now up and fully welded. Next comes 2 inch angle for the top edge of containers in front, then concrete jacks and formboards to reinforce the galvalume we'll use as concrete pans.
Progress

More white paint, makes things look a bit more civilized looking. Of course, this is only the first coat, and we know th...
06/01/2024

More white paint, makes things look a bit more civilized looking. Of course, this is only the first coat, and we know the rust neutralizer will bleed through a bit, especially the top floor, but sealing everything means no more oxidation. Next, the galvanized 3-1/2 inch edging around the top of our steel work that will also be the concrete form when we pour the marquesina roof

What a difference a little paint makes. No more black blotches from rust converter on old faded yellow. 3 sides of the h...
03/01/2024

What a difference a little paint makes. No more black blotches from rust converter on old faded yellow. 3 sides of the house master suite are freshly white, at least first coat.

It took a while, but superstructure for Marquesina is finished. Columns are 12ga 3x3 inch square steel galvanized tubing...
28/12/2023

It took a while, but superstructure for Marquesina is finished. Columns are 12ga 3x3 inch square steel galvanized tubing, holding up lots of 4 inch 7.7 pound I-beam. It will sit for a couple weeks now, because the sheet metal shop making our border for the concrete roof is closed until after 3 kings day. Remember, in Puerto Rico, Christmas is a 2 month holiday.

More progress in Fionas Paradise's marquesina. Couple more 4 inch beams, weld then galvalum, rebar and concrete.
22/12/2023

More progress in Fionas Paradise's marquesina. Couple more 4 inch beams, weld then galvalum, rebar and concrete.

Dirección

Rio Grande Beach
Aguada
00602

Página web

Notificaciones

Sé el primero en enterarse y déjanos enviarle un correo electrónico cuando Fiona's Paradise publique noticias y promociones. Su dirección de correo electrónico no se utilizará para ningún otro fin, y puede darse de baja en cualquier momento.

Contacto La Empresa

Enviar un mensaje a Fiona's Paradise:

Compartir