01/14/2018
Here is a list of some of the things we got done last year ,Thanks Mikie.
Things Done!!!!!
Week of 5-25-2017
1. Replace Tub in Cabin #1 with Shower and update Walls & floor
2. Install shower curtain cabin #1
3. Hang power cord In Sharon’s room
4. Remove beds out of bedrooms cabin new floors
5. Reconnect clothes line wires
6. Put house number on mail box post
7. Put license plate on trailer
8. Fix printer tray, Sharon’s
9. Pick up water valves at Ferguson in Alamosa
10. Fix Limb Chopper it won’t start and needs blades sharpened
11. Repair heater in mobile home #3
12. Bolt tool box to truck
13. Install robe hanger cabin #1
14. Assemble yard swings
15. Repair and brace Melissa’s day bed frame
16. Repair lawn mower blade will not turn
17. Screw down septic tanks lids
18. Hang work light in sewing room
19. Remove knives in chipper
Week of 6-4-2017
20. Fill, smooth and seed ditch cabin #1
21. Contact county to spray for mosquitos ( Sharon)
22. Replace carpet and vinyl in cabin #1
23. Reassemble queen bed in cabin #1
24. Rehang chicken shade
25. Repair / replace chipper hitch
26. Move metal roofing
27. Move shipping containers
Week of 6-11-2017
28. Fix bathroom heater in cabin #1
29. Fix water heater vent pipe in cabin #1
30. Fix living room heater k**b cabin #1
31. Hook up air conditioner / door in cabin #1
32. Check and replace elect. Outlets as needed in cabin #1
33. Assemble metal shelves for shipping containers
34. Pressure wash equipment and etc. for Auction
35. Redo cleanout for men’s bath
36. Caulk shower in cabin #1
37. Assemble N.T.” Stools
38. Order two left hand twin beds
39. Assemble fire rings
40. Remove refrigerator in prowler trailer
41. Clean up yard limbs
Week of 6-18-2017
42. Replace north toilet in men’s bathroom
43. Clear ground 15 foot around resale propane tank
44. Put vent cap on water heater cabin #1
45. Replace refrigerator in prowler trailer (did not work)
46. Hang air conditioner for office/house
47. Change grill in recreation room / store old grill in # 2 storage container
48. Remove yard water valve site # 18
49. Mow and w**d eat camp ground
50. Rig permanent water for new trees
51. Clean tools for auction
Week of 6-25-2017
52. Install new knives in chipper
53. Organize and put up auction tools and supplies
54. Cleaned yard from storm
55. Assemble 2 shelves
56. Adjust flywheel brakes on chipper
57. Replace south toilet in women’s bathroom
Week of 7-2-2017
58. Install one new twin bed cabin #2
59. Rehang Livingroom Curtin mobile home
60. Clear site #17
61. Repair twin bed drawer #2
62. Get ice 25- 10 lbs. bags
63. Move fire ring to site #25
64. Replace toilet in prowler trailer
65. Prep and put in service #3 mobile home air conditioner
66. Replace Log Splitter Tires
67. Remount backhoe Seat
68. Repair roof leak in prowler trailer
69. Replace fuel line yard vacuum
70. Pick up ditch
71. Remove propane tank from mobile home site #24
72. Fertilize new trees
73. Concrete around cleanout for men’s bath
74. Fix water leak & REPLACE VALVE SEAT site 13
75. Whack w**ds
Week of 7-9-2017
76. Rebuild prowler trailer door
77. Get temporary tags for goose neck trailer
78. Pickup hardwood flooring
79. Cut cottonwood down by Ron
80. Unload tall pine trees
81. Store hardwood flooring in container
82. Repair water leek men’s toilet
83. Repair leaks in circle drip system
84. Fit noise in air conditioner #3
85. Plant small blue spruce
86. Assemble shelf
87. Install 3 shelves and load, container #1
88. Remove form from concrete and fill in hole
Week of 7-16-2017
89. Add filter screen to irrigation pump
90. Check and replace elect. Outlets as needed in cabin #2
91. Check and replace elect. Outlets as needed in mobile home
92. Rehang elect. Box pond well house
93. plant 13 tall pine trees
94. Weld Hustler steering arm
95. Weld Shepard hooks
96. Weld fire ring to base plate
97. Weld fork lift tong
98. Weld collars on water wagon
99. Remove 12 volt plug on tongue do not use 110 volt plug
100. Weld nut for hitch on chipper
101. Make attachment for pulling irrigation line
102. Repair leak at John’s (irrigation water)
103. Hang windshield washer bucket in flower bed
Week of 7-23-2017
104. Irrigation line to Dennis’s
105. Assemble shelves from northern tool & install in container #1
106. Clean up rocks, roots, metal & etc. around new trees
107. Level/smooth ground around new trees
108. Paint all irrigation water valves/risers purple
109. Level/smooth ground around men’s sewer clean out
110. Add water valve vacuum breaker to sites 11 thru 19 use lock tight
111. Mow
112. Repair pond pipe
Week of 7-30-2017
113. Change twin beds in cabin #1
114. Clean pond pump water strainer
115. Clean (pressure washer), stain and seal walk bridge
116. Pick up gas close dryer Alamosa
117. Pickup yellow sprinklers and hoses
118. Bury 220 feet of irrigation pipe site 11 thru 17
119. Install faucets for tree drip system site 17
120. Put storage shelves in center office
121. Build portable chick pin
122. Repair sewer drain in front of carport
123. Fill potholes in driveway
124. Get both propane tanks filled to 85%
125. Remove trees along south west hwy. fences
Week of 8-27-2017
126. Pick up Mikie!!!!!!!!!!!!!!!!!!!!!!!!!
127. Install drip lines to trees sites 11 thru 15
128. Splice irrigation water pipe where Mark cut it
129. Filter Paint for well house
130. Pressure wash sewer leach field
131. Talk with Freeman Gingerich About quotes for concrete work for garage, driveway pad, RV sites and New recreation hall /laundry/showers
132. Buy 30 ‘ x 1/4” sewer hose for pressure washer
133. Raise pond well house and paint “Barn Red”
134. Repair and cover leach field for office, cabin #1, #4 & #5
135. Make a replacement seat for Mark’s walker
136. Get mini van’s right rear tire repaired
137. Convert used dryer to propane
138. Clear highway 17 fence
139. Clear highway17 ditch
140. Move drainage ditch between cabin #1 and RV site #45
141. Repair hyd. Leak on case back hoe.
142. Change oil, filter and air filter in lawn mower
Week of 9-18-2017
143. Remove top soil north of Gurage / shop
144. Redo corner post highway fence north end
145. Move RV elect. pedestals from inside shop to inside fence
146. Move portable propane tanks from inside shop to inside fence
147. Move box of filters, red carpenter tool box, buckets of wall texture, roof vent tubes and much more from shop to lean to
148. Metal (Forest Green) roof pond well house
149. Replace exhaust fan men’s bathroom
150. Repair light at site 15
151. Remove wooden shelves
Week of 9-24-2017
152. Raise garage door for new floor
153. Remove storage lockers from garage
154. Remove metal shelf from garage
155. Move Sharan’s sewing counter from container to front porch
156. Move peg board to front porch
157. Move fuel and oil storage to fenced in area
158. Disassemble wooden shelf
159. Move tool boxes to container
160. Relocate things stored on walls
161. Relocate table’s contents to new location
162. Move elect. Storage bins to bathroom wall
163. Remove pipe fitting bins from garage
Week of 10-1-2017
164. Cut opening for new north door
165. Run new wiring shop split upper plug from lower (220 volts split, wall outlets every 4’ to 6’)
166. Install used clothes dryer maid side
167. Unload pickup truck
168. Send in water samples
169. Move leaking washer to rec hall to be repaired
170. Empty sewing room
171. Move Mickie’s trailer
172. Make 30’ 220 volt extension cord for table saw
173. Cut down two cottonwood tree in park center
174. Finish metal trim on Pond well house roof
175. Dig up cedar trees and temporarily plant in buckets
176. Dig onions
Week of 10-8-2017
177. Cut bathroom roof back to make room for garage ceiling
178. Rough frame and hang windows ( four)
179. Welded hangers for garage heater
180. Install & level 2x4s, 2x6s & vertical brace for garage ceiling (turn crown up)
181. Hang garage heater
182. Run gas line for garage heater
183. Install motor mounts for generator
184. Run elec. Wire in boxes
185. Burn tree trimmings
Week of 10-15-2017
186. Gather pond trash brush limbs and burn
187. Gather circle trash tree limbs and burn
188. Clean Dennis’s yard Burn trash limbs from spring tree trimming
189. Sewing room, Prep walls
190. Install North door in garage (replace hinge screws with longer ones)
191. Repair small Gate in fenced in area
192. Repair Gates on fenced in area (2)
193. SEWING ROOM, , Lay vinyl floor MDM
Week of 10-22-2017
194. SEWING ROOM ,new floor register MDM
195. Repair insulation in well house #2
196. Remove & Replace Roof well house #2 with metal Forest Green
197. Move rafters from south of garage center of circle
198. Install heat tape to pipes in well house #2
199. Clear obstacles from concrete pour area
200. Move light poles north of fence to circle
201. Move Richardson’s RV and clean up there area
202. Fix leak in cabin #1 bathroom
Week of 10-29-2017
203. Pick up playground equipment from Alamosa
204. Clear concrete south of garage
205. Move rafters
Week of 11-5-2017
206. Dig up old water line to cabin #1
207. Dig new ditch for cabin # 2 waterline
Week of 11-12-2017
208. Dig new ditch for tenters water line
209. Replace leaking shark bite fitting to cabin #1
210. Raise garage door top opening
211. Fill ditch from green box to cabin #1 tee
212. Fill ditch to 10 foot of cabin #2
213. Install waste valve and riser valve tenters
214. Fill ditch to tenters riser valve.
215. Make frame for concrete leach field #2
216. Add heater to chicken water
217. Remove cabin #2 shout off valve for relocation
218. Prep garage for concrete.
219. Repair sewer & irrigation pipes broken during installation of new water lines
Week of 11-19-2017
220. Install waste valve to cabin #2 & connect to cold water pipe
221. Check for leaks and repair as needed
222. After #2, Fill ditches.
223. Winterize cabin #1
224. Winterize cabin #2
225. Winterize laundry & shower house
226. Winterize maids room
227. Board up south garage door temperately
228. Redo cabin #2 outside water valve (west side to south side)
229. Install water Faust for tenters
Week of 12-17-2017
230. Replace battery cables on ford tractor
231. Replace fuel filter on ford tractor
232. Set steel fence post for north driveway south side
233. Install fan & 6” duct between Mark’s bedroom and office
234. Add elect. For vent (receptacle in hallway & switch in Marks room)
235. Clean & organize Marks bedroom in preparation for new bed
236. Buy kitchen cabinets from habit for humanity
Week of 12-17-2017
237. Plant Lilac south end of shower/laundry
238. Pick up fire wood from garden spot
239. Rake driveway with tractor