04/05/2026
We are finally at the stage of casting the floor beams along with the floor slab. The pool walls and sun-pod floor will also be. All beams were verified and found to be as per the approved plans, including spacing and rebar sizes. The floor slab matting reinforcement bars was also inspected, with steel placed at 8 inches center to center, as specified. All steel works are in compliance with the plans ✅.
The pool structure was reviewed as well. Both the pool walls and sun-pod floor have double matting installed correctly 🏊♂️
An inspection was also carried out on all rough-ins, including electrical, water lines, and waste lines 🔌🚰
It was confirmed that starter rebars for the walls were left in place, as well as the starter rebars for the ramp.
Construction plastic was also placed under the rebar matting throughout the entire area, as required 🧱
The only remaining item observed is the final touch of flashing around the sun pad wall area, since the sun pad wall will be cast separately.
Curing agent has been applied to all steel and will be reapplied tomorrow early morning prior to casting 💧 The casting is scheduled for early tomorrow.